Skip to content

Delivering a new benchmark for sustainable healthcare.

Client
Department for Infrastructure and Transport / SA Health
Contract
Managing Contractor
Location
South Australia
Duration
29 months

Kangkanthi, The Queen Elizabeth Hospital’s new five-level Clinical Services Building, has transformed the delivery of emergency, critical, surgical and rehabilitation care across Adelaide’s western suburbs.

Delivered within a fully operational hospital precinct, the redevelopment brings together highly complex clinical environments, specialist medical equipment and future-ready infrastructure in Australia’s first all-electric major public healthcare building. Through collaborative planning, technical expertise and carefully managed delivery, the facility was completed on time without any unplanned disruption to existing hospital services.

Delivering within a live hospital

Construction was undertaken immediately adjacent to a fully operational hospital and included critical connections into existing infrastructure and refurbishment works within live clinical areas.

Every stage of the works was carefully planned to protect patients, staff and hospital services. Construction zones were fully separated, building services were isolated where required, and all works were completed under strict infection control protocols approved by SA Health’s Clinical Infection Control team.

Through careful planning and disciplined delivery, the project was completed without a single unplanned disruption to hospital operations.

Australia’s first all-electric major public hospital

Kangkanthi is Australia’s first all-electric major public healthcare building, setting a new benchmark for sustainable healthcare. Designed to reduce operational emissions while supporting future models of care, the facility combines high-performing building systems with practical, long-term environmental outcomes.

41.8%  Reduction in greenhouse gas emissions

99.96%  Construction waste diverted from landfill

6 Star  All-electric public healthcare building

Collaboration that delivered certainty

Working together from the earliest stages of the project allowed decisions to be made early and challenges to be resolved before construction began. Built Environs worked closely with the client, clinicians, consultants and trade partners throughout design development, procurement and delivery.

During the Part A phase, we identified a significant number of value management opportunities. Many were incorporated into the final design, helping establish the Guaranteed Construction Sum (GCS) while maintaining the project’s clinical intent and supporting delivery under budget.

BIM and detailed services coordination enabled thousands of kilometres of complex building services to be installed clash-free, improving productivity across TQEH’s new Clinical Services Building.

Keeping the hospital running - construction was delivered alongside a fully operational hospital, with critical connections, refurbishments and staged works completed without any unplanned disruption to clinical services.
“A place with meaning - named Kangkanthi, the Kaurna word for "to care", the building reflects its connection to Country and the community it serves through Indigenous artwork, storytelling and cultural design.”
Built around patient care - the new Clinical Services Building brings together emergency, imaging, surgical, intensive care and rehabilitation services in one integrated facility.
Digital engineering supported every stage of delivery, improving coordination, reducing rework and giving the client a permanent digital record of concealed services and building systems for future maintenance.
Ready for day one - our in-house Biomedical Engineering team coordinated the procurement, installation and commissioning of major medical equipment and furniture, ensuring the facility was ready to support patient care just six weeks after Practical Completion.