Delivering complex healthcare in a live environment.

Client
Department of Infrastructure and Transport / SA Health
Contract
Managing Contractor
Location
South Australia
Duration
25 months

The Modbury Hospital Upgrade transformed one of South Australia’s busiest hospitals while maintaining uninterrupted clinical services throughout construction. Delivered across multiple stages within a fully operational campus, the project provided more than 13,000m² of new and refurbished clinical facilities, including operating theatres, inpatient wards, outpatient services and critical infrastructure upgrades.

Working directly above, below and alongside live hospital departments, Built Environs carefully coordinated construction, services upgrades and infection control to maintain patient care while delivering every separable portion on or ahead of programme. The redevelopment provides contemporary healthcare environments that support improved models of care for Adelaide’s northern communities.

Delivering in a live hospital

Construction was undertaken within one of South Australia’s busiest operational hospitals, with every work area located adjacent to live clinical environments.

Working closely with SA Health, hospital staff and the consultant team, Built Environs carefully planned staging, access, infection prevention measures, services isolations and noisy works to minimise disruption. Significant demolition, major infrastructure upgrades and more than 85 tonnes of latent asbestos removal were completed while maintaining uninterrupted hospital operations and protecting patients, staff and visitors.

Despite the complexity of the project, every stage was delivered safely, with no unplanned disruption to clinical services.

Building certainty through digital engineering

Point cloud scanning and BIM modelling played a critical role in managing the challenges of refurbishing a hospital originally constructed in the 1970s.

Existing structures and services were scanned following demolition and incorporated into the coordinated model, allowing the team to identify more than 200 latent conditions before construction commenced. This proactive approach reduced rework, improved coordination between trades and consultants, and supported efficient delivery across multiple concurrent work fronts.

Seeing problems before they reached site

Point cloud scanning and BIM coordination identified more than 200 latent site conditions, enabling solutions to be resolved digitally before construction began

Quality from day one

Quality assurance was embedded throughout delivery, from prototype rooms and detailed inspections through to commissioning and photographic wall close-out records.

This disciplined approach enabled hospital staff to occupy completed areas almost immediately after handover, with facilities operating as intended from day one and fewer than 100 defects identified across more than 13,000m² of clinical facilities during consultant inspections.

Delivered within a fully operational hospital campus.
“Nationally recognised for excellence in healthcare construction.”

2023 Master Builders Australia National Health Facility Award

The new General Medical Unit provides contemporary inpatient accommodation designed to support better patient outcomes and staff workflows.
New operating theatres support contemporary surgical care.