
Transforming how the Gold Coast moves through better-connected transport.
- Client
- Queensland Government
- Contract
- Public Private Partnership
- Location
- Queensland
- Duration
- 30 months
Built Environs delivered the building works for the Gold Coast Light Rail as an integrated joint venture partner with McConnell Dowell and part of the GoldLinQ consortium.
16 stations and a new tram depot
Our team delivered 16 light rail stations along the 13-kilometre route connecting Griffith University, Southport and Broadbeach, together with the depot and maintenance facility.
The works included footings, structures, cladding and building services, alongside design management and coordination with the wider rail infrastructure and rolling stock.
Building within a major transport corridor
Construction required careful coordination across a busy urban environment. Existing gas, water and telecommunications services were relocated, roads were levelled and widened, and station construction was integrated with track, overhead wiring and surrounding infrastructure.
The new light rail created an important public transport connection for the Gold Coast and formed part of the city’s preparations for the 2018 Commonwealth Games.
13 kilometres of light rail and 16 stations connecting key destinations across the Gold Coast.

















